Brief Description of firm’s work and responsibility in this project:
Master Meter, Water Main, and Force Main Replacement. Install approximately 3,800 linear feet of 12-inch water line, 4,000 linear feet of 8-inch force main, 4 directional drills beneath the Kentucky River, 1 master meter vault, and appurtenances.